From complex pipe rehabilitation projects to reliable, everyday plumbing solutions, our work consistently reflects the deep expertise, advanced techniques, and meticulous precision that Perry Plumbing and Pipelining brings to every job, no matter the size or scope.

San Diego
Father Joe’s Village
- Set up dust containment as needed in work areas, cut access holes in drywall or tile walls located above sinks, toilets, and showers to access waste and vent piping
- Use chain flail with carbine tips to clean, scrape, and
remove hard scale build up inside cast iron piping - Flush and wash down debris inside piping, perform video inspection to provide recording and report of conditions to waste and vent piping
- Work areas include Kitchen, Health Clinic, 1st Floor Public Restrooms, 2nd Floor Public Restrooms, 3rd Floor Men’s Dorm Room Restroom, and 2nd Floor Women’s Dorm restroom

San Diego
Loma Palisades
- Installed approx. 1200’ of 4” and 6” epoxy liner and approx. 35 fitting liners from building out to city connections.

San Diego
Compass Rose
- Descale and flush 6.5” of line from outside the back of yacht to remove scale buildup and old epoxy in aluminum line
- Camera for pre video inspection and measurements
- Install up to 25’ of CIPP (cure in place pipe) hard epoxy liner in 2 locations from both access points outside of boat toward engine room stopping before flange
- Camera line for post video inspection

San Diego
Comercia Bank
- Completely descale and flush up to 40’ of 6” roof drain
- Working from drains at 11th floor bathroom (access made in drywall of bathroom) and working in bank ceiling
- Installed up to 190’ of horizontal pipe of 6” hard, structural epoxy pipe liner
- Liner holds 20yr warranty and a 50yr manufacturer guarantee

San Diego
The Plaza – Irvine Co
- Epoxy lining top 50’ of 6” roof drain
- Completely descaled and flushed up to 50’ of 6” cast iron roof drain
- Started liner right before 90° fitting pointing vertical, continuing 50ft down 6” vertical line
- Liner is a hard structural liner that can be snaked without voiding the warranty
- Liner has a 20yr commercial warranty, 50yr manufacturing guarantee
- Points of access were roof, parking structure, and 10th floor conference room to remove 6” Santee fitting

San Diego
Marriot Marquis
- Cut and remove 2 sections of 8” cast iron pipe in ceiling of mechanical room of North Tower to gain access to drain line
- Descale and flush roof drain line from open access in mechanical room and from roof drain basin to remove hard scale build up in cast iron line
- Install up to 50’ of CIPP hard epoxy liner from open access back towards roof drain basin up to WYE connection to seal crack in drain line #1
- Use gapping method to not cover other lateral connections
- Camera line for post video inspection
- Install new pipe and fittings, no hub stainless steel bands where section of pipe was removed, test line for leaks

San Diego
The Plaza – Irvine Co
- Epoxy lining top 50’ of 6” roof drain
- Completely descaled and flushed up to 50’ of 6” cast iron roof drain
- Started liner right before 90° fitting pointing vertical, continuing 50ft down 6” vertical line
- Liner is a hard structural liner that can be snaked without voiding the warranty
- Liner has a 20yr commercial warranty, 50yr manufacturing guarantee
- Points of access were roof, parking structure, and 10th floor conference room to remove 6” Santee fitting

San Diego
Marriot Marquis
- Cut and remove 2 sections of 8” cast iron pipe in ceiling of mechanical room of North Tower to gain access to drain line
- Descale and flush roof drain line from open access in mechanical room and from roof drain basin to remove hard scale build up in cast iron line
- Install up to 50’ of CIPP hard epoxy liner from open access back towards roof drain basin up to WYE connection to seal crack in drain line #1
- Use gapping method to not cover other lateral connections
- Camera line for post video inspection
- Install new pipe and fittings, no hub stainless steel bands where section of pipe was removed, test line for leaks

San Diego
Southland Plaza
- Installed thousands of feet of 4” epoxy liner under all buildings on property and mainlines in parking lot
- Descale and flush roof drain line from open access in mechanical room and from roof drain basin to remove hard scale build up in cast iron line
- Install up to 50’ of CIPP hard epoxy liner from open access back towards roof drain basin up to WYE connection to seal crack in drain line #1
- Install up to 20’ of CIPP from open access back upstream to seal off crack in drain line #2
- Use gapping method to not cover other lateral connections
- Camera line for post video inspection
- Install new pipe and fittings, no hub stainless steel bands where section of pipe was removed, test line for leaks

Vista
Vista Detention Center
- Epoxy lined damaged section of cast iron sewer main
- Completely descaled approx. 32’ of 4” of cast iron sewer line all the way to 6” connection
- Using quick cure heat assist machine installed up to 15’ of 4” hard sewer pipe liner
- Liner has 20yr root intrusion warranty- liner is a hard structural liner that can be snaked

San Diego
Flamingo Trailer Park
- Installed thousands of feet of 4” and 6” epoxy liner under all trailers and loading out to city connections

San Diego
One America Building
- Lined 2”- 3”- 4” epoxy liner in downstairs Pizza Kitchen, from parking garage up to restaurant

San Diego
AT&T Building
- Complete pipe rehabilitation of over 300 feet of 6” sewer line under imported Italian marble lobby.
- Also installed approx. 10 fitting liners down main hallway in building sewer line.

San Diego
Orleans East
- Epoxy lined priority areas of four separate buildings: completely descaled and flushed sections of main sewer line
- Installed hundreds of feet of 4” hard epoxy liner, liner has 20yr root intrusion warranty and a 50yr manufacturer guarantee

El Cajon
La Vida Real
- Complete pipe rehabilitation of over 300 feet of 6” sewer line under imported Italian marble lobby.
- Also installed approx. 10 fitting liners down main hallway in building sewer line.

Wendover
Peppermill Wendover Hotel & Casino Reno
- Installed thousands of feet of 3” and 4” epoxy liner in kitchen and hotel room risers.
- Complete pipe rehabilitation – descaling, flushing, investigation, cleaning, lining of pipe, and pre/post camera inspection
- Used CIPP technology to install liner in existing cast iron pipes
- Created new structural pipe inside the host pipe to renew old systems and bridge gaps in voided or missing pipe sections Replace section with new Type L copper piping and fittings

Reno
Western Village Inn & Casino
- Installed thousands of feet 2”-8” of epoxy liner in multiple kitchens and restroom locations Complete pipe rehabilitation- descaling, flushing, investigation, cleaning, lining of pipe, and pre/post camera inspection
- Used CIPP technology to install liner in existing cast iron pipes
- Created new structural pipe inside the host pipe to renew old systems and bridge gaps in voided or missing pipe sections Replace section with new Type L copper piping and fittings

Reno
Redhawk Golf & Resort
- Lined Hundreds of feet in kitchen of Club House, high temperature epoxy was used.
- Complete descaling and flushing cast iron pipe, 10yr warranty included.

Wendover
Peppermill Wendover Hotel & Casino
- Installed thousands of feet of 3” and 4” epoxy liner for kitchen and hotel room risers. Complete pipe rehabilitation- descaling, flushing, investigation, cleaning, lining of pipe, and pre/post camera inspection
- Used CIPP technology to install liner in existing cast iron pipes
- Created new structural pipe inside the host pipe to renew old systems and bridge gaps in voided or missing pipe sections Replace section with new Type L copper piping and fittings

Wendover
Montego Bay Casino Resort
- Installed thousands of feet of 2” – 8” epoxy liner for kitchen and risers
- Complete pipe rehabilitation- descaling, flushing, investigation, cleaning, lining of pipe, and pre/post camera inspection
- Used CIPP technology to install liner in existing cast iron pipes
- Created new structural pipe inside the host pipe to renew old systems and bridge gaps in voided or missing pipe sections Replace section with new Type L copper piping and fittings

Wendover
Rainbow Casino Hotel
- Installed thousands of feet of 3” and 4” epoxy liner in kitchen and hotel room risers
- Complete pipe rehabilitation- descaling, flushing, investigation, cleaning, lining of pipe, and pre/post camera inspection
- Used CIPP technology to install liner in existing cast iron pipes
- Created new structural pipe inside the host pipe to renew old systems and bridge gaps in voided or missing pipe sections Replace section with new Type L copper piping and fittings